Author Archive

Congratulations to our Newest PEs!

May 24, 2016  |   News,Uncategorized   |     |   Comments Off on Congratulations to our Newest PEs!

RH2 is proud to announce that Clayton Posey, Harley Sandoval, Laura Reiter, and Mike Reiter are now Licensed Professional Engineers in the State of Washington. Kris Lillie is now a Registered Professional Engineer in the State of Oregon.

New P.E.s: Devon Petit, Eric Smith, and Michael Voth!

December 17, 2014  |   News,Uncategorized   |     |   Comments Off on New P.E.s: Devon Petit, Eric Smith, and Michael Voth!

RH2 is proud to announce that Devon Petit, Eric Smith, and Michael Voth are now Licensed Professional Engineers in the State of Washington!

Jon Conner now a licensed S.E. in Oregon

May 22, 2014  |   News   |     |   Comments Off on Jon Conner now a licensed S.E. in Oregon

RH2 is proud to announce that Jon Conner has passed the Professional Structural Engineering exam for the state of Oregon!

David Baisch now a licensed P.E.

May 20, 2014  |   News   |     |   Comments Off on David Baisch now a licensed P.E.

RH2 is proud to announce that David Baisch has passed the Professional Engineering exam and is our newest licensed civil engineer!

Mark Braaksma now a licensed P.E.

May 20, 2014  |   News   |     |   Comments Off on Mark Braaksma now a licensed P.E.

RH2 is proud to announce that Mark Braaksma has passed the Professional Engineering exam and is our newest licensed electrical engineer!

Jon Conner Now a Licensed S.E.

January 28, 2014  |   News   |     |   Comments Off on Jon Conner Now a Licensed S.E.

RH2 is proud to announce that Jon Conner has passed the Professional Structural Engineering exam and is our newest licensed SE!

Port of Vancouver selects RH2 to provide On-Call Engineering Services

January 28, 2014  |   News   |     |   Comments Off on Port of Vancouver selects RH2 to provide On-Call Engineering Services

RH2 is excited to have the privilege to work for the 3rd largest port authority in Washington State.

Kennewick Irrigation District, Kiona Intake and Booster Pump Station

October 23, 2013  |   Irrigation,Projects   |     |   Comments Off on Kennewick Irrigation District, Kiona Intake and Booster Pump Station

The Kennewick Irrigation District’s $5.3 million Kiona Intake and Booster Pump Station project is a new 6,300 gallon per minute (gpm) pump station and freshwater intake off the Yakima River. This is the first phase in an approximately $15.2 million construction project to bring irrigation water to the prestigious Red ...

Seismic Evaluation Study of the Valley View and View Acres Reservoirs, Oak Lodge Water District

September 05, 2013  |   Projects,Structural,Water   |     |   Comments Off on Seismic Evaluation Study of the Valley View and View Acres Reservoirs, Oak Lodge Water District

RH2 evaluated four reservoirs for structural deficiencies and seismic vulnerability for the Oak Lodge Water District in Oak Grove, Oregon. Two of the reservoirs were 5.0 MG partially buried, prestressed concrete reservoirs built in 1965 and 1988. The other two reservoirs were 2.8 MG welded steel reservoirs built in 1966 ...

Wastewater Treatment Facility Upgrades, City of Cashmere

September 05, 2013  |   Projects,Wastewater   |     |   Comments Off on Wastewater Treatment Facility Upgrades, City of Cashmere

The City of Cashmere owns and operates a lagoon system wastewater treatment facility (WWTF); however, the WWTF’s treatment capacity was not able to keep up with recent increases in environmental regulations. RH2 was tasked to prepare a Facility Plan and design upgrades that will meet the new total maximum daily ...