top of page

ACEC WA Bronze Award for Engineering Excellence | 2011

2009-2010 Enclosed Lateral Improvements, Sunnyside Division Board of Control

Installation of approximately 18.5 miles of pipeline, converting open channel irrigation ditches to enclosed pressurized irrigation mains. RH2 assisted in design, bidding and construction inspection of the project on a very condensed timeline.

bottom of page